Pro Pull Kit for Construction

$2,025.00

Six Week Look Ahead Boards with Posters and Logs for Construction

 

Pro Pull Tool Bag for Construction

Phase Pull Planning Paper for Construction (1 sheet)

SKU: PULLKIT-STD Category:

Description

Every skilled trade mechanic knows that to do a job well, without struggle or improvisation, requires all the right tools. The same holds true for efficient pull planning. Unified Works, Inc. is pleased to announce that we have successfully developed the industry’s first comprehensive and standard Pro Pull Kit.

Our Pro Pull Planning Kit has all the right tools and accessories necessary to set up and operate a first-rate pull plan, anywhere. All you have to do is click or call now, we will ship your kit right to your office or job site and you and your team will have the necessary tools to “Pull Like A Pro”.

Our Pro Pull Kit consists of the following:

  • Phase Pull Plan (1 pad of 50 sheets) and Six Week Look Ahead (5 pads of 50 sheets/pad-250 tags total) sticky tags custom printed in 20 different colors, one for each trade
  • Custom printed Constraint and Target Condition (Milestone) sticky tags printed on neon-colored paper
  • Pro Pull Plan Six Week Look Ahead Boards (6) that are 88″ tall x 48″ wide with Moveable Swim Lanes
    NOTE: There are 2 versions of the 6WLA boards.

    • Option A – 6WLA Boards WITH the days of the week identified at the top.
    • Option B – 6WLA Boards WITHOUT the days of the week identified at the top.
  • Dry Erase Laminated Logs and Posters
    POSTERS (4)

    • DOWNTIME (36″ tall x 24″ wide)
    • TIMMESS (36″ tall x 24″ wide)
    • 10 STEPS TO WEEKLY PULL PLANNING (36″ tall x 24″ wide)
    • 9 STEPS TO RUNNING AROUND THE HORN (36″ tall x 24″ wide)

    LOGS (4) Preprinted Dry Erase Laminated Logs

    • Constraint (24″ tall x 36″ wide)
    • Parking Lot (24″ tall x 36″ wide)
    • Variance & Percent Plan Complete (36″ tall x 24″ wide)
    • Plus / Delta (36″ tall x 24″ wide)
  • 1 – Sheet of Phase Pull Planning Paper (4’x10′ preprinted)
  • 1 – Customized Unified Works Tool Bag
  • 2 – 3″x3″ Blank yellow post-it notes
  • 12 – Bungee cord swim lanes
  • 24 – Sharpie markers
  • 4 – Dry erase markers with adhesive clip
  • 1 – Roll of blue painters tape
  • 1 – Package name badges (100 total)
  • 1 – Penalty Flag
  • 1 – Pad of Sticky Note Flags

The tags and key accessories are provided in a professional tool bag for secured storage and transportation.  The boards are laid out with lanes, foldable, portable, reusable, and ready to hang. The logs are detailed, durable, spacious, and also reusable.  Both the boards and logs are easy to set up and takedown, after project completion the boards and logs are ready to move on to the next “Pull Like A Pro Session”.

Unified Works, Inc. – Sticky Refill Tags for Construction are available for purchase.

 

Additional information

Six Week Look Ahead Boards with Posters and Logs for Construction

Weight 52 lbs
Dimensions 52 × 34 × 5 in
Option

A – WITH Days Of Week, B – WITHOUT Days Of Week

Pro Pull Tool Bag for Construction

Weight 17 lbs
Dimensions 18 × 12 × 9 in

Phase Pull Planning Paper for Construction (1 sheet)

Weight 4 lbs
Dimensions 49 × 3 × 3 in